Corona PLUS

Problèmes Ouverts: 55 Problèmes Clos: 49 808 Problèmes Pris en compte: 357
  • 215 S Howard St Corona CA 92879, United States - Corona

    They added what looks like several un permitted buildings for what looks like residential use.

    the building at the rear of property looks way too close to the allowed setbacks, and falling apart around the roof.

  • 475 Hidden Valley Pkwy Norco CA 92860, United States - Norco
    Lights are not working in parking lot
  • 1901 W Ontario Ave Corona, CA 92882, USA - Corona
    this location is digging using big machinery and a crane of some sort. The amount of dirt flying on the air is soo bad. the drilling is causing my windows to shake all day.
  • OtherOuvert
    W Rincon St Corona CA 92860, United States - Corona
    Old furniture & rug in the brush on the south side of Rincon between Corydon & Butterfield Also a tarp & large pieces of styrofoam along Rincon between Butterfield & Smith.
  • 1450 Laurelwood Cir Corona, CA, 92882, USA - Corona
    Home looks abandoned with dry brush/ weeds 3-4ft high. Trash left on driveway for weeks. Fire hazard.
  • 225 W 6th St Corona, CA, 92882, USA - Corona
    Banner has detached from post. Directly across Library between bank building and abandoned CareMore building.
  • 380 E Rancho Rd Corona, CA, 92879, USA - Corona
    Flag is wrapped around pole
  • W 6th St & Yorba St Corona, CA, 92882, USA - Corona
    Hometown Hero banner has fallen off the holder and is hanging loose.
  • Serfas Club Park 2575 Green River Rd, Corona, CA 92882, USA - Corona
    Explicit graffiti on playground equipment
  • 150 Depot Dr Corona, CA, 92882, USA - Corona
    Graffiti on depot building facing train tracks
  • Via Bernardo & 6th St Corona, California, 92882 - Corona
    5 AGO HMA LSW ALL BLK CLOTHES ON VIA BERNARDO HEADED AWAY FROM SIXTH ST TAGGING IN ITEMS IN RED SPRAY PAINT
  • 200-284 N Main St Corona, CA, 92880, USA - Corona
    Graffiti on the main street under pass by the train station is getting worse as well as trash and debri from transients. Can this be cleaned up? The metrolink trains will be out of service next week 12/26-12/30, maybe that would be a good time to coordinate the cleanup during a window of time when the trains are not running