But it's looking good. The new concrete bridge is in. Sidewalks are mostly in, curbs and manholes are in. One layer of asphalt appears done and based on height of remaining manhole would think that one more run with the asphalting is in order.
Then I suppose railings and all that stuff -- but, still, soon if you want to hit Route 5 and head north, you don't have to get on 91.