Description
Contractors had this ramp ripped up for a week last November and never filled in the street side, which they dug up to do the rebuild. Standing water in photo shows the extent o the missing pavement. Why should someone in a wheelchair have to negotiate that? I won't even use it on my bike.
3 Comments
Acknowledged Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Closed Boston Open311 (Verified Official)