الوصف
Currently you have an area of sidewalk that is marked for repair on Bethany Road. Just about 50 yards away on Mid-Broadwell there are two areas of broken sidewalk. Hopefully, you will be able to repair these two areas at the same time. Thank you for all you have done. Here is a link to the two images: http://dougpics.smugmug.com/ClcikFix/n-bPW6D
7 تعليقs
تم إقراره COAADMIN (تم التحقق رسميا)
COAADMIN (تم التحقق رسميا)
مغلق COAADMIN (تم التحقق رسميا)
This sidewalk repair has been completed.
While in the area our crews noted additional sidewalk segments that required repair or attention. These additional areas are now being repaired, and all work is expected to be completed by April 3.
فتح Doug Hope (ضيف)
مغلق COAADMIN (تم التحقق رسميا)
The subject sections did not "fall between the cracks." We were unable to complete all of the sections on April 3 due to unrelated issues for which our crew had to be withdrawn and reassigned.
Weather issues prevented us from returning to the location ntil today. The weather forecast fro April 4 included a 70% chance of rain. This was followed by heavy rain on Monday which left the ground saturated on Tuesday. We cannot pur sidewalk sections in wet conditions, as the concrete will not properly set and cure.
Our crew will be back on site today to comlpete the work.
COAADMIN (تم التحقق رسميا)
zupatl770 (مستخدم مسجل)