说明
1200-1700 Blks Bellevue Ave: pushed up asphalt, low places, cracked asphalt, needs attention. Roadway Supv noted these are not potholes
1200-1700 Blks Bellevue Ave: pushed up asphalt, low places, cracked asphalt, needs attention. Roadway Supv noted these are not potholes
19 评论s
已确认 RVA Care Warrior (注册用户)
8/4/2014 - 8/4/2014 - Thanks so much for communication with Richmond City Government online. This matter has been formally submitted to Richmond DPU Mgmt (20020950444) to ask them to please check for restoration of DPU Cut patches along the 1200-1700 Blks Bellevue. Also Richmond Pavement Mgmt (20020950446) has been asked to inspected this small general area for resurfacing of the streets in this small neighborhood area too. There are two requests in motion for this location
We appreciate your communication that helps us in “Building The Best Richmond” together – rtt
RVA Care Warrior (注册用户)
RVA Care Warrior (注册用户)
RVA Care Warrior (注册用户)
taz4021@cavtel.net (注册用户)
taz4021@cavtel.net (注册用户)
Odin's Dad (注册用户)
taz4021@cavtel.net (注册用户)
The patch jobs are terrible, when riding over them it feels like you are on an off road course and your teeth chatter.
I really cannot understand why the job was done so poorly, it would seem that if the effort is made to do the job, then it should be done correctly.
Can we get this repaired correctly and smoothly?
Thanks,
taz4021@cavtel.net (注册用户)
Odin's Dad (注册用户)
taz4021@cavtel.net (注册用户)
taz4021@cavtel.net (注册用户)
taz4021@cavtel.net (注册用户)
taz4021@cavtel.net (注册用户)
Odin's Dad (注册用户)
Looks like proper resurfacing was done late last week in the 1200 & 1300 blocks, associated with the recent utility work that was done there. This also addressed one of the bad potholed areas in the 1200 block. There are now signs up for street work later this week east of this in the 1200 block as well, just west of Lamont. Hopefully, the washboard in the EB lane here will be fixed as part of this work.
The block just east of Hermitage is still bad, however.
taz4021@cavtel.net (注册用户)
taz4021@cavtel.net (注册用户)
taz4021@cavtel.net (注册用户)
Odin's Dad (注册用户)
A paving crew is there today, working in the 1300 to 1400 blocks. Thanks!
That said, there are still pothole issues in the 1200 and 1600 blocks as noted above.