Descrição
Full repaving in summer 2012 lasted less than a week, water main break destroyed the intersection.
The repaving job was substandard. Pot holes, dips, bumps. Vehicles swerve in all directions to navigate this minefield.
Solicitante
Full repaving in summer 2012 lasted less than a week, water main break destroyed the intersection.
The repaving job was substandard. Pot holes, dips, bumps. Vehicles swerve in all directions to navigate this minefield.
Comentários