说明
between 50-52 Eastview Road. A new storm drain was installed. Rocks were put in, but it was never completed with asphalt. Rocks have been washed away with the most recent rains
between 50-52 Eastview Road. A new storm drain was installed. Rocks were put in, but it was never completed with asphalt. Rocks have been washed away with the most recent rains
2 评论s
Plymouth, CT (官方验证)
已确认 Highway Superintendent (官方验证)
We understand that we need to pave that trench before winter.
J.W.S 9-28-23