Mô tả
A utility cut was made in the road many months ago and it still hasn't been paved over. Compare to utility cut made in the same road last week, but located closer to Poole Road. It has been paved over in less than a weeks' time of being cut open.
Please pave over this utility cut.
cũng đã hỏi...
Hỏi. Where is this located?
Đáp. Streets
Đáp. Streets
Hỏi. What is the type of failure?
Đáp. Other
Đáp. Other
Hỏi. Please describe the failure.
Đáp. Utility cut in road not fully repaired and paved over
Đáp. Utility cut in road not fully repaired and paved over
5 Bình luậns
Được thừa nhận City of Raleigh 3 (Chính thức đã xác nhận)
Đã đóng City of Raleigh 3 (Chính thức đã xác nhận)
Reopened Ray (Người dùng đã đăng ký)
The pavement cut has been partially repaired. It appears cold patch was put down on about half of the hole and the remainder filled with gravel.
So, I'll give you an "A-Plus" for responsiveness, but a "C" for execution.
Still wonder why the several other pavement cuts for utility work on the same street were paved over with Hot Mix Asphalt and properly rolled, compacted and smoothed within a day or two of backfilling the hole while this one remains disrespected and unloved?
Được thừa nhận City of Raleigh 3 (Chính thức đã xác nhận)
Đã đóng City of Raleigh 3 (Chính thức đã xác nhận)