Mô tả
Would it be possible to adjust the timing of the light at Hembree and Highway 9 during peak traffic times? With Rucker being closed and Hembree being used as the alternate traffic backs up almost all the way to Elkins in the mornings.
Would it be possible to adjust the timing of the light at Hembree and Highway 9 during peak traffic times? With Rucker being closed and Hembree being used as the alternate traffic backs up almost all the way to Elkins in the mornings.
Public commenting and status changes are not available for this issue.
4 Bình luậns
Department of Transportation (Người dùng đã đăng ký)
Được thừa nhận Traffic Engineering (Người dùng đã đăng ký)
Traffic Engineering (Người dùng đã đăng ký)
Colleen (Người dùng đã đăng ký)